Quote

From:

1-13819 232nd Street
Maple RIdge, BC, V4R0C7
Ph: 778-833-3473

info@cands.ca

Quote Number QUO-11131
Quote Date January 28, 2020
Total $117,628.50
To:
BLT Construction Services

901-89 West Georgia Street
Vancouver, BC V6B 0N8

ORANGE THEORY FITNESS

SCOPE:

ELECTRICAL - SUPPLY AND INSTALL ALL ELECTRICAL COMPONENTS AS PER PROJECT DRAWINGS WITHIN PROJECT SCOPE AREA.

EXCLUSIONS:

  • CIVIL WORK
  • CUTTING/CORING
  • FIRESTOP
  • LIGHT FIXTURES
  • IT COM BACKBONE
  • IT RACK
  • WAPS
  • SECURITY SYSTEM DEVICES AND OR WIRING
  • CEILING FANS
  • MECHANICAL CONTROL WIRING
  • FIRE ALARM
  • DDC CONTROLS

SCOPE:

HVAC - SUPPLY AND INSTALL ALL NECESSARY HVAC COMPONENTS BASED ON MECHANICAL DRAWING M4

  • SUPPLY AND INSTALL ONE NEW WSHP-5-2
  • SUPPLY AND INSTALL ONE NEW FFH-1 FORCED FLOW HEATER
  • SUPPLY AND INSTALL ONE NEW ERV-1
  • BALANCING INCLUDED WITH REPORT
  • SEISMIC LETTER OF SIGN OFF INCLUDED

EXCLUSIONS:

  • CUTTING, CORING, FIRESTOP
  • SCANNING & XRAY
  • NEW EQUIPMENT OTHER THAN THE ITEMS STATED ABOVE
  • MECHANICAL PLUMBING CONNECTIONS TO WSHP INCLUDING DRAINAGE (TO BE DONE BY OTHERS)
  • GAS SCOPE ( TO BE DONE BY OTHERS)
  • CONTROLS OTHER THAN THERMOSTAT AND REMOTE SENSORS

ALL DUCTING, FITTINGS, GRILLS AND REGISTERS INCLUDED

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Electrical Scope

-PERMIT
-ROUGH WIRING
-CONDUIT
-DATA/STRUCTURED CABLING
-LIGHTING INSTALL
-FINISHES
-1 PANEL RELOCATION
-ASHRAE COMPLIANCE AS PER PROJECT DRAWINGS

$47,750.000.00%$47,750.00
1 HVAC SCOPE

SUPPLY AND INSTALL ALL NECESSARY HVAC COMPONENTS SHOWN ON M4 MECHANICAL DRAWINGS

$59,185.000.00%$59,185.00
Sub Total $106,935.00
GST $10,693.50
Total $117,628.50