| Quote Number | QUO-11226 |
| Quote Date | October 7, 2020 |
| Total | $95,232.90 |
Description of Work:
This work will be completed to engineered drawings, BC Hydro, and safety authority standards. Sites must be accessible by our trucks. Alternative Contracting Ltd. will perform a BC One Call, however it is the customer’s responsibility to identify and locate all utilities on site. This quote does NOT include if required, rock blasting, or excavation of rock, tree clearing, rock drilling, hydro vac, and/or environmental permitting. Our quote is in effect for 30 days. Final sign off of permits will not occur until payment is received in full. We would require a deposit of 50% before work begins to secure material costs.
| Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
|---|---|---|---|---|
| 1 | Electrical Service Installation | $89,800.00 | 1.00% | $90,698.00 |
| Sub Total | $90,698.00 |
| GST | $4,534.90 |
| Total | $95,232.90 |