Quote

From:

1-13819 232nd Street
Maple RIdge, BC, V4R0C7
Ph: 778-833-3473

info@cands.ca

Quote Number QUO-11188
Quote Date June 1, 2020
Total $112,140.00
To:
Onnie Group

401- 19800 LOUGHEED HWY PITT MEADOWS HVAC, AND ELECTRICAL QUOTE

HVAC

  • SUPPLY AND INSTALL 4 NEW 4 TON PACKAGE ROOFTOP UNITS
  • SUPPLY AND INSTALL 2 NEW ROOF CURBS
  • SUPPLY AND INSTALL 3 NEW CURB ADADPTORS FOR EXISTING CURBS
  • SUPPLY AND INSTALL 6 NEW THERMOSTATS AND CABLE (1 FOR EXISTING UNIT)
  • SUPPLY AND INSTALL DUCT DROPS FOR 4 NEW UNITS

ELECTRICAL:

  • PERMITS
  • CO ORDINATION FOR SHUTDOWNS
  • SUPPLY AND INSTALL 4 200A 208V PANELS WITH TRANSFORMERS IN UNITS 401A, B, C, AND D
  • SUPLLY AND INSTALL 1 400A 208V PANEL AND TRANSFORMER IN UNIT 401E
  • WIRING OF 1 NEW 7.5 TON RTU
  • WIRING OF 4 NEW 4 TON RTUS
  • SUPPLY AND INSTALL 4 LED HIGH BAY LIGHTS PER UNIT 20 LIGHTS TOTAL
  • BACK CORRIDOR LIGHTING AND WIRING TO WASHROOMS TO BE WIRED TO HOUSE PANEL. CORRIDOR LIGHTS TO BE SUPPLIED BY ONNI
  • METER BASES
  • FIRE ALARM AS NEEDED WITH VERIFICATION
  • EMERGENCY LIGHTING/EXIT SIGNS
  • DISTRIBUTION MAIN SWITCHGEAR BREAKERS

 

Hrs/Qty Service Rate/PriceAdjustSub Total
1 HVAC SCOPE
$34,900.000.00%$34,900.00
1 ELECTRICAL SCOPE $71,900.000.00%$71,900.00
Sub Total $106,800.00
GST $5,340.00
Total $112,140.00