Quote

From:

1-13819 232nd Street
Maple RIdge, BC, V4R0C7
Ph: 778-833-3473

info@cands.ca

Quote Number QUO-11213
Quote Date August 5, 2020
Total $2,730.00
To:
Onnie Group

Address: 505-19055 Airport Way    PO:PMC-29445

Electrical

  • -        Supply and install wiring, materials, equipment & all electrical to meet plans in construction/architectural drawings
  • -        Supply and install one (1), 2x2 troffer light into T-bar ceiling in single washroom
  • -        Supply and install one (1) light switch for single WC
  • -        Supply and install one (1) receptacle as per Onni standards for universal WCs
  • -        All electrical work to meet code requirements
  • -        Wire Hot Water Tank to electrical panel
  • -        Supply and install one (1) occupancy sensor for new WC
  • -        Permits & Inspections
  • -        Wiring of one (1) bathroom fan

HVAC

  • -        Supply and install, supply and return ducting as required for single WC
  • -        Supply and install one (1) washroom exhaust fan in T-bar grid with required ducting/venting
  • -        Supply and install HVAC and ducting as required to accommodate space plan
  • -        Contractor to supply own lift as required
  • -        Supply b-vent for WC exhaust roof penetration. Roofers to install

Sprinkler

  • -        Supply and install one (1) new sprinkler head with escutcheon for single WC
  • -        Obtain engineering, permits, and inspections as required
  • -        Seismic as required – sprinklers to be dropped and clipped into T-bar 2x2 ceiling

Exclusions:

  • Cutting
  • Coring
  • Firestop
  • Roof Penetrations
  • Exhaust fan only - no other hvac components

Note:

  • Sprinkler permit to be carried by building permit
Hrs/Qty Service Rate/PriceAdjustSub Total
1 Electrical Scope, HVAC, and Sprinkler $2,600.000.00%$2,600.00
Sub Total $2,600.00
GST $130.00
Total $2,730.00