| Quote Number | QUO-11217 |
| Quote Date | September 9, 2020 |
| Total | $21,214.20 |
5451 275 Street Langley
ADASTRA LABS ETHANOL EXPANSION PROJECTÂ
| Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
|---|---|---|---|---|
| 1 | ETHANOL EXPANSION PROJECT SUPPLY AND INSTALL STAINLESS STEEL MOUNTING RACK SYSTEM FOR CHILLER PIPING AND DISTRIBUTION SUPPORT |
$3,560.00 | 0.00% | $3,560.00 |
| 1 | ETHANOL EXPANSION PROJECT SUPPLY AND INSTALL COPPER FOR SUPPLY AND RETURN CHILLER DISTRIBUTION BASED ON EVOLVED LAYOUT AND NEEDS. PIPING, VALVES, BLEEDERS, FLANGES |
$10,350.00 | 0.00% | $10,350.00 |
| 1 | ETHANOL EXPANSION PROJECT ADDITIONAL SUPPORTS REQUIRED BY EVOLVED FOR DISTRIBUTION PIPING SUPPLIED AND INSTALL BY THEM. STAINLESS STEEL GRADE |
$2,320.00 | 0.00% | $2,320.00 |
| 1 | ETHANOL EXPANSION PROJECT SUPPLY AND INSTALL MATERIAL PIPING FOR AIR LINES REQUIRED BY EVOLVED. FED FROM MAIN AIR LINE DISTRIBUTION MAINS. COPPER AND STAINLESS MATERIAL FOR PIPING AND VALVES. |
$3,974.00 | 0.00% | $3,974.00 |
| Sub Total | $20,204.00 |
| GST | $1,010.20 |
| Total | $21,214.20 |