| Quote Number | QUO-11129 |
| Quote Date | January 27, 2020 |
| Total | $62,870.50 |
ETHICAL BEAN
ALL WORK IS TO BE COMPLETED DURING REGULAR WORK HOURS.
ELECTRICAL
SUPPLY AND INSTALL ALL ELECTRICAL COMPONENTS AS PER PROJECT DRAWINGS WITHIN PROJECT SCOPE AREA.
HVAC
SUPPLY AND INSTALL ALL NECESSARY COMPONENTS BASED ON MECHANICAL DRAWINGS M2.0, m2.1 ONE NEW EF-1 FAN, ROUND SUPPLY DUCTING AND 8 EXPOSED GRILLS. RELOCATE AND ADD NEW THERMOSTATS AS NOTED
SPRINKLERS
DEMO 6 SPRINKLER HEADS BASED ON DRAWINGS FP2.0. NO NEW SPRINKLERS INCLUDED. REPLACEMENT OF CORRODED HEADS WILL BE DETERMINED ON SITE. EXISTING OVERHEAD SYSTEM TO COMPLY WITH NEW LAYOUT.
EXCLUSIONS
| Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
|---|---|---|---|---|
| 1 | SPRINKLER SCOPE DEMO 6 HEADS. NO NEW HEADS INCLUDED |
$1,200.00 | 0.00% | $1,200.00 |
| 1 | HVAC SCOPE SUPPLY AND INSTALL OF THE ABOVE NOTED ITEMS |
$9,000.00 | 0.00% | $9,000.00 |
| 1 | ELECTRICAL SCOPE PERMIT |
$45,500.00 | 1.00% | $45,955.00 |
| 1 | HVAC - ENGINEERING PLEASE ADD FOR CAD DRAWINGS |
$1,000.00 | 0.00% | $1,000.00 |
| Sub Total | $57,155.00 |
| GST | $5,715.50 |
| Total | $62,870.50 |