Quote

From:

1-13819 232nd Street
Maple RIdge, BC, V4R0C7
Ph: 778-833-3473

info@cands.ca

Quote Number QUO-11256
Quote Date February 19, 2021
Total $139,860.00
To:
Elevation Building Solutions

PEDRE HVAC SCOPE QUOTATION

  • Supply and install all new ducting, fittings, hangers and grills as shown on Mechanical drawings
  • Supply (1) New 10 Ton ICP package rooftop unit (alternate priced)
  • (7) New Exhaust fans
  • (1) EDH-1 Thermolec duct heater with accessories
  • (11) Dynamic fire dampers
  • Transfer air boxes
  • Air balance included with report
  • Return air to be plenum with eggcrate grills in ceiling tiles

 

EXCLUDED

  • Cutting, coring, firestop
  • Roof and wall penetrations
  • Seismic engineering
  • Gas to rooftop units
Hrs/Qty Service Rate/PriceAdjustSub Total
1 HVAC SCOPE $133,200.000.00%$133,200.00
Sub Total $133,200.00
GST $6,660.00
Total $139,860.00

Add a comment

Your email address will not be published. Required fields are marked *