Quote

From:

1-13819 232nd Street
Maple RIdge, BC, V4R0C7
Ph: 778-833-3473

info@cands.ca

Quote Number QUO-11230
Quote Date October 27, 2020
Total $176,715.00
To:
elevation building solutions

Pedre 101-199B Langley

HVAC BUDGET

  • Supply and install distribution ducting to accommodate new space plan including mezzanine
  • Supply and install new 24x24 supply air diffusers (Qty 50)
  • Supply and install new eggcrate return
  • Supply and install 3 new digital thermostats
  • Relocate unit heaters outside of new demising wall (rehang and re/re/ ducting)

SPRINKLER BUDGET

  • Supply and install sprinklers to accommodate space plan received
  • Engineering included
  • Seismic to NFPA 13 code
  • City of Langley Permit
  • No new zones allowed- additional cost if required by city or engineer

PLUMBING BUDGET

  • *WESTCOAST WATER SOLUTIONS TO SEND THROUGH QUOTE- THIS IS FOR REFERNCE NUMBER ONLY*

 

Seperate price:

  • Supply and install (2) 7.5 ton Package Rooftop Units ( Heating and A/C)- For main level space
  • Supply and install (1) 3 ton Package Rooftop Unit (Heating and A/C)- For mezzanine space
  • Crane included
  • RTU Curbs included
  • (3) RTU Economizers with controls
  • Comfort balance only no Balancing report included unless necessary

EXCLUSIONS

  • Cutting, coring, firestop
  • Roof or exterior wall penetrations
  • Fire extinguishers
  • Ariel or platform lifts
  • Gas to be included in plumbing. Can price on a seperate cost basis
Hrs/Qty Service Rate/PriceAdjustSub Total
1 HVAC DISTRIBUTION BUDGET
$63,400.000.00%$63,400.00
1 SPRINKLER BUDGET
$27,800.000.00%$27,800.00
1 HVAC RTU SCOPE AND INSTALL
$39,600.000.00%$39,600.00
1 PLUMBING BUDGET- CARRIED BY WESTCOAST WATER SOLUTIONS $37,500.000.00%$37,500.00
Sub Total $168,300.00
GST $8,415.00
Total $176,715.00