ROSEBUD MM PROJECT
SUPPLY AND INSTALL HVAC EQUIPMENT ONLY.
EXCLUSIONS
*NOTE ALTERNATE EQUIPMENT SPEC'D WHERE NEEDED. LG PACKAGE SUPPLIED. SPECD DECIBLE RATINGS MAY NOT BE ACHEIVED. TO CONFIRM WITH ENGINEER
* GAS DETECTION PACKAGE CAN BE PRICED IF NEEDED
* MUA PRICED AS MODINE (FORMERLY KNOWN AS AIREDALE) AS SPECD. ALTERNATES CAN BE PROVIDED FOR COST SAVINGS IF APPROVED
* ALTERNATE SPEC PACKAGE WILL BE FORWARDED FOR ENGINEERS APPROVAL PRIOR TO ACCEPTANCE
ELECTRICAL SUPPLY AND INSTALLATION AS PER PROJECT DRAWINGS: PRICING BASED UPON CONDUIT HR WITH BX BRANCH CIRCUITRY
INCLUSIONS:
EXCLUSIONS:
| Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
|---|---|---|---|---|
| 1 | HVAC EQUIPMENT ONLY SCOPE SUPPLY AND INSTALL THE ABOVE NOTED EQUIPMENT ONLY. CONNECTIONS AND DUCTING TO BE DONE BY OTHERS. |
$114,480.00 | 0.00% | $114,480.00 |
| 1 | ELECTRICAL SCOPE |
$120,148.51 | 0.00% | $120,148.51 |
| 1 | GAVITA FIXTURES |
$21,850.00 | 0.00% | $21,850.00 |
| 1 | 4' STRIP / 4' HIGH BAY FIXTURES | $6,001.49 | 0.00% | $6,001.49 |
| Sub Total | $262,480.00 |
| GST | $13,124.00 |
| Total | $275,604.00 |